A- A+

Environmental Requirements

CONSTRUCTION BULLETIN 9

The majority of the contents of Construction Bulletin #9 have been incorporated into various Alberta Transportation documents as follows:

Item 1 - section 4.5 of "Engineering Consultant Guidelines for Highway, Bridge and Water Projects, Volume 1 - Design and Tender, 2011"

Item 2 - section 2.3.4 of "Engineering Consultant Guidelines for Highway, Bridge and Water Projects, Volume 2 - Construction Contract Administration, 2013"

Item 5 - the requirements for handling topsoil and subsoil both within and outside the highway right-of-way have been updated and are detailed in specification 2.3 of "Standard Specifications for Highway Construction, Edition 14, 2010 " and subsequent editions of the specification manual.

Item 7 - section 4.5.2.1 and 4.5.2.2 of "Engineering Consultant Guidelines for Highway Bridge and Water Projects, Volume 1 - Design and Tender, 2011". The Pre-disturbance Assessment and Post-disturbance Assessment documents pertaining to Borrow Excavation are located on the Alberta Transportation website List of "Environmental Requirements" - These items would normally be addressed through the Environmental Construction Operations Plan required under specification 2.3, Grading of "Standard Specifications for Highway and Bridge Construction, Edition 14, 2010". The "Environmental Construction Operations Plan Framework" document is located on the Alberta Transportation website.