A- A+

Photos of existing area prior to construction

ImageA silt fence ensures run-off from the exposed soil doesn’t enter local bodies of water.
ImageWick drains are 10 m long strands of synthetic material inserted into the ground that will draw moisture out and allow for faster compression of the soil.
ImageOur owl boxes allow you to view a live feed of Highway 2.
ImagePile driving equipment is used to construct the piers for the new bridges.
ImageHighway 2 looking SouthEast
ImageHighway 2 and Taylor Drive looking North
ImageHighway 2 and Gaetz looking North
ImageHighway 2 Overpass at Taylor Drive
ImageView of Highway 2 from Taylor Drive
ImageHighway 2 near Gasoline Alley and future location of southbound C-D road