Engineering Consultant Guidelines for Highway, Bridge and Water Projects (Volume 1) - Design and Tender

Manuals

ENGINEERING CONSULTANT GUIDELINES FOR HIGHWAY, BRIDGE AND WATER PROJECTS - Volume 1 - 2011
ENGINEERING CONSULTANT GUIDELINES FOR HIGHWAY, BRIDGE AND WATER PROJECTS - Volume 1 - 2002

Any omissions, obvious errors, or recommendations for future updates regarding the above documents should be forwarded to the following email: ECGfeedback@gov.ab.ca

Download Forms

  • APPENDIX H - Utility Adjustment Agreements (Samples)
    • Sample 1 (doc 31K) – Letter of Notification
    • Sample 2 (doc 33K) -  Letter Requesting for Cost Estimate
    • Sample 3 (doc 40K) – Letter of Confirmation of Cost Estimate and Signing Agreements
                                               (Telecommunication and Power Company)
    • Sample 4 (doc 31K) - Letter of Confirmation of Cost Estimate and Signing Agreements (Pipeline Company)
    • Sample 5 (doc 54K) – Roadway Upgrading Pipeline Crossing Agreement
                                               (Pipeline Adjustment is required)
    • Sample 6 (doc 41K) –  Roadway Upgrading Pipeline Crossing Agreement
                                                (Pipeline Adjustment is not required)
    • Sample 7 (doc 90K) –  New Roadway over Existing Pipeline Crossing Agreement
    • Sample 8 (doc 42K) – Letter of Confirmation of Cost Estimate (New Railway Crossing)
    • Sample 9 (doc 42K) - Letter of Confirmation of Cost Estimate (Existing Railway Crossing Upgrading)
    • Sample 10 (doc 31K) - Letter of Confirmation of Commencement of Construction
    • Sample 11 (doc 35K) - Utility Agreement with ATCO Electric Ltd.
    • Sample 12 (doc46K) - Roadway Upgrading Pipeline Crossing Agreement with ATCO Pipeline Ltd. or ATCO Gas Ltd. (with or without Pipeline Adjustment is required)