ACP SuperPave MQA

MINIMUM QUALITY ASSURANCE TESTING REQUIREMENTS

ASPHALT CONCRETE PAVEMENT - SUPERPAVE SPEC 3.53, MANAGED QA  

TEST

15-Feb-00

STANDARD

MINIMUM FREQUENCY

ATT- DATA

SHEETS

SAMPLING

1. Mix

2. Cores(Obtained byContractor)

Stratified Random Test Sites for ACP Projects

Coring(Monitor Contractor's Coring)

3. Aggregate

 

ATT-37

 

ATT-56

 

ATT-5

ATT-38

 

1 Five per Lot (full Production)

 

Each Lot

One per Segment

As required for Correction Factor

MAT 6-82
MIX TESTING

1. Asphalt Content

 

2. Correction Factor, Extracted Asphalt Content

3. Correction Factor, Ignition Asphalt Content

4. Mix Moisture Content

 

5. Field Formed Gyratory Specimens*

 

 

ATT-12 Part II or ATT-74

 

ATT-12 Part III

ATT-74

 

ATT-15

 

AASHTO TP-4

 

2One per Segment for each QA Acceptance Lot

As specified in ATT-12 Part III

As specified in ATT-74 Part II

1Five tests per Lot(Full Production)

1Five (2 Specimen tests)per Lot

(Full Production)

 

MAT 6-79

MAT 6-98

MAT 6-100

MAT6-101

MAT 6-75

MAT 6-99

MAT 6-80S

MAT 6-80S

MAT 6-80

AGGREGATE TESTING

1. Extraction or Ignition Sieve Analysis

2. Correction Factor Aggregate Sieve Analysis

 

ATT-26

 

ATT-26

 

Each sample, QA Acceptance Lot

As required

MAT 6-79

MAT 6-98

MAT 6-100

MAT6-101

MAT 6-75

MAT 6-25

OTHER RELATED TESTING

1. Density Immersion Method, Saturated Surface Dry

2. Voids Calculations, Cores or Formed Gyratory Specimens using Gmm*

3. Percent Compaction, Asphalt Concrete Pavement (% of Gmm)*

4. Maximum Specific Gravity of Bituminous Mixes (Gmm)*

 

ATT-7

 

ATT-36

 

ATT-67

ASTM D2041

 

Each core or formed specimen

Each core or formed specimen

 

One per Segment

1Five tests per Lot

(Full Production)

 

MAT 6-80S

 

MAT 6-80S

MAT 6-79

MAT 6-78

MAT 6-79

PAVEMENT SURFACE

1. Smoothness

2. Segregation

 

ATT-59

Segregation Rating Manual

 

Each Sub Lot

Each Lane.Km

 

MAT 6-73

MAT 6-95

REPORTING

All Approved Asphalt Mix Designs and Changes in Job Mix Formula

2. Superpave Lot Paving Report

3. Profilograph & Segregation

Fax completed Superpave Mix Design & JMF Summary Sheet to Highway Engineering Section @ 422-5426 and Project Sponsor. Provide written documentation to Contractor for approved designs and JMF changes. Include copies of all mix designs and JMF approvals in Final Details

Complete MAT 6-78S Superpave Lot Paving Report

Report in Final Details as outlined in Contract Administration Manual. Fax early submission copy of Final Details ACP EPS form to 422-5426 within one month of paving completion.

  MAT 6-73 and MAT 6-95s

1 Note: One sample for the first two hours of production; one immediately after, remaining samples at random over the rest of the day. Full production is considered when a Lot has more than eight hours of plant production.

2 Note: On QC Acceptance Lots a minimum of 1 asphalt content is to be done using test procedures specified in Table 3.53.4 TEST METHODS ON SUPERPAVE MANAGED QA PROJECTS. Estimated asphalt contents are also to be determined based upon the individual measured Maximum Specific Gravity test values of the loose mix samples (test procedure under development).

Testing requirements as per MQA specifications for Superpave mixes are briefly summarized as follows:

- Consultant to sample loose mix from behind the paver for the formation of Gyratory specimens and determination of Maximum Specific Gravity (Gmm).

- Contractor to obtain core samples at site locations determined by the Consultant.

- For QA Acceptance Lots, testing for asphalt content and gradation is to be conducted in a timely manner however this may be done in an off-site Lab located outside of a one hour travel radius. All other testing is to be done in a laboratory located no more than a one-hour drive from the centre of the project.

  • All lots are to be identified on the Lot Paving Report as being either a QA Acceptance Lot or a QC Acceptance Lot. Contractor quality control test results for asphalt content and gradation are to be reported on the Lot Paving Report for QC Acceptance Lots. For QC Acceptance Lots, estimated asphalt contents are to be determined based upon the measured Gmm values of loose mix and reported on the Lot Paving Report. On QC Acceptance Lots a minimum of one asphalt content is also to be done using test procedures specified in Table 3.53.4.
  • The minimum number of QA Lots in which full QA testing including asphalt content and gradations is required shall be as follows:

The first two Lots of production for each mix type used, plus

a minimum of one additional Lot for each 60,000 tonnes, or portion thereof, of total ACP contract tender tonnage, plus

one additional Lot of top lift production, for each mix type, if two or more lifts are specified.